Milk Ranch Well 24 Hour Report: Initial testing of the well. Addresses the issue of sand in the well. Prepared by Mr. Ploughe and provided by Mr. Pugel.
Milk Ranch Well Seven Day Pump Test: Sustained yeild test at 140 gpm. Indicates that water quality testing was performed and is within EPA limits. Prepared by Mr. Ploughe and provided by Mr. Pugel.
The claim was made by Mr. Haney that the Milk Ranch Well can be connected to the system for $20,000 in his testimony to the ACC. We have found that the approach he outlined will not work due to the location of pressure reduction valves in the system. Our analysis is here.